aimsdog
Create
SystemAIS-003Industrial and critical infrastructure

Supplier Document Classifier

Classify incoming supplier documentation for the QMS intake queue.

AI Act tier
Minimal risk
Status
Retired
State
Retired
Owner
Bron Helstrom
Readiness
68
Blockers
2

Controlled evolution states, in advance, how this AI System is allowed to change. It is the source of the predetermined change control plan, not a separate document.

Where the change plan stands
0 planned modifications in the boundary, 0 with an impact assessment. No boundary is recorded, so no modification can be authorised.

Key details

The evolution boundary as agreed. Everything below is read from it.

No controlled evolution boundary is recorded. A planned modification cannot be authorised until the boundary exists.

Planned modifications

Part 1 of a predetermined change control plan. Each row is one specific, planned change.

A change described before it is made, with its acceptance criteria.

Modification protocol

Part 2 of the plan, in the four parts the FDA expects: data management, re-training, performance evaluation and update procedures.

Impact assessment

Part 3 of the plan: the benefits, the risks introduced, the mitigations and the cumulative effect of the modifications together.

Change authorisation

The change authorisation gate reads the same findings shown on the governance map.

GateOutcomeOpen blockers
Change authorisationHeldNot recorded

When the boundary, the modification protocol and the impact assessment are complete, the predetermined change control plan is assembled on the PCCP tab.