aimsdog
Create
SystemAIS-006Industrial and critical infrastructure

Turbine Vibration Guard

Detect abnormal vibration signatures on gas turbines and request a controlled shutdown before bearing failure.

AI Act tier
High-risk (Annex I safety component)
Status
In development
State
In progress
Owner
Louis Wu
Readiness
68
Blockers
2

The plan is assembled from the records. It is not a separate document to maintain. Where a record is incomplete, the plan states the gap in place of the text, and the plan cannot be exported.

Where the plan stands

Two measures, read together. A section can be written and still draw on a record that is short.

Sections written
1 of 10

9 still to write.

Source records complete
All complete

No record named by the plan is missing text.

Change control findings
None open

No change-control rule is failing.

One band per section, in document order
Complete Written, a source record is short Not written

Export

A plan is exported only when every section is written and no change-control finding is open.

The plan cannot be exported
  • 9 of 10 sections are unwritten.
  • Description of modifications, State the scope of each planned modification on the controlled evolution tab.
  • Modification protocol, data management, State how data is collected, curated and held independent between training and testing.
  • Modification protocol, re-training practices, State the triggers, the frozen protocol and the controls applied when re-training.
  • Modification protocol, performance evaluation, State the metrics, the test data and the acceptance criteria for each modification.
  • Modification protocol, update procedures, State how an update is authorised, released, communicated and rolled back.
  • Impact assessment, Record the benefits, the risks, the mitigations and the cumulative impact of each modification.
  • Change boundary and reassessment triggers, Record the controlled evolution boundary for this AI System.
  • Monitoring and rollback, Record the monitoring plan and the rollback plan on the controlled evolution boundary.
  • Transparency and labelling, Map the AI System to the frameworks it is assessed against.

Predetermined change control plan for AIS-006

Turbine Vibration Guard. Markets: European Union, United Kingdom. Regulatory class: High-risk (Annex I safety component). Assembled from the records under controlled evolution.

Context

1Device and model description

Complete

Detect abnormal vibration signatures on gas turbines and request a controlled shutdown before bearing failure. Safety component of a regulated product. Operational limits and the human oversight plan are being drafted. Deployed configuration: undefined.

Drawn from AIS-006 Turbine Vibration Guard.

Part 1

2Description of modifications

Not written

No planned modification states its scope.

This section is not written. State the scope of each planned modification on the controlled evolution tab.

Part 2(a)

3Modification protocol, data management

Not written

No planned modification states its data management practices.

This section is not written. State how data is collected, curated and held independent between training and testing.

Part 2(b)

4Modification protocol, re-training practices

Not written

No planned modification states its re-training practices.

This section is not written. State the triggers, the frozen protocol and the controls applied when re-training.

Part 2(c)

5Modification protocol, performance evaluation

Not written

No planned modification states how performance will be evaluated.

This section is not written. State the metrics, the test data and the acceptance criteria for each modification.

Part 2(d)

6Modification protocol, update procedures

Not written

No planned modification states its update procedures.

This section is not written. State how an update is authorised, released, communicated and rolled back.

Part 3

7Impact assessment

Not written

No planned modification has an impact assessment.

This section is not written. Record the benefits, the risks, the mitigations and the cumulative impact of each modification.

Part 1

8Change boundary and reassessment triggers

Not written

No controlled evolution boundary is recorded.

This section is not written. Record the controlled evolution boundary for this AI System.

Part 2(d)

9Monitoring and rollback

Not written

No monitoring plan or rollback plan is recorded.

This section is not written. Record the monitoring plan and the rollback plan on the controlled evolution boundary.

Context

10Transparency and labelling

Not written

No framework mapping is recorded.

This section is not written. Map the AI System to the frameworks it is assessed against.